When a commercial agreement contains an arbitration clause, resolving a contractual dispute may require arbitration rather than conventional court proceedings.

For businesses, contractors, developers and investors operating in Dubai, the Dubai International Arbitration Centre (DIAC) provides an established institutional framework for resolving domestic and international commercial disputes.

But how does a company initiate DIAC arbitration? What documents are required? Which arbitration rules apply? How much does the procedure cost, and who determines the dispute?

To commence DIAC arbitration, a claimant must establish an applicable arbitration agreement, prepare and submit a compliant Request for Arbitration, pay the required registration fee and comply with the relevant procedural requirements.

However, successful registration of an arbitration case does not independently establish the validity of the arbitration agreement, the jurisdiction of the arbitral tribunal or the merits of the underlying claim.

This guide explains the DIAC arbitration procedure in Dubai, including preliminary legal requirements, supporting documents, institutional costs, tribunal appointments and important considerations before commencing proceedings.

1. Understanding DIAC Arbitration in Dubai

1.1 What Is the Dubai International Arbitration Centre?

The Dubai International Arbitration Centre is an independent arbitration institution that administers proceedings under its applicable arbitration rules.

Its institutional framework is established by Dubai Decree No. 34 of 2021 Concerning the Dubai International Arbitration Centre.

DIAC provides institutional administration, while the appointed arbitral tribunal determines the substantive dispute.

This distinction is important because DIAC itself does not ordinarily decide whether a contractor is entitled to payment, whether a commercial agreement has been breached or whether a claimant should receive compensation.

Those matters are determined by the competent arbitral tribunal.

1.2 What Types of Disputes Can Be Referred to DIAC?

Subject to the arbitration agreement and applicable legal restrictions, DIAC arbitration may be used for disputes involving:

  • Commercial agreements.
  • Construction and engineering contracts.
  • Unpaid contractual amounts.
  • Shareholder agreements.
  • Joint venture agreements.
  • Distribution and supply contracts.
  • Property-related contractual disputes.
  • Professional services agreements.
  • Contractual termination.
  • Cross-border business transactions.

Not every category of legal dispute is necessarily capable of arbitration.

Certain matters may remain subject to mandatory judicial or statutory jurisdiction.

An arbitration clause should always be assessed alongside the legal arbitrability of the underlying dispute.

1.3 DIAC Arbitration Versus Court Litigation and Mediation

Dispute resolution mechanismGeneral function
DIAC arbitrationPrivate adjudication by an appointed arbitral tribunal
Dubai Courts litigationJudicial determination under the applicable court framework
DIFC Courts litigationJudicial determination within the jurisdiction of the DIFC Courts
MediationFacilitated negotiation aimed at an agreed settlement
Contractual dispute boardsProject-specific dispute avoidance or adjudication mechanisms

Arbitration generally produces a binding award, whereas mediation seeks a voluntary agreement between the parties.

Our guide to arbitration versus litigation in UAE construction disputes provides further analysis of the differences between these dispute resolution mechanisms.

2. Legal Framework Governing DIAC Arbitration

2.1 UAE Federal Arbitration Law

For arbitration governed by the UAE federal arbitration framework, the principal legislation is Federal Law No. 6 of 2018 Concerning Arbitration, as amended by Federal Decree-Law No. 15 of 2023.

The federal arbitration framework addresses matters including:

  • Arbitration agreement validity.
  • Capacity and authority to agree to arbitration.
  • Appointment and challenges of arbitrators.
  • Arbitral tribunal jurisdiction.
  • Procedural fairness.
  • Interim protective measures.
  • Arbitral awards.
  • Recognition, enforcement and annulment.

Parties should consult the applicable consolidated legislation when commencing arbitration or assessing the enforceability of an arbitration agreement.

The arbitration agreement, institutional rules and mandatory law governing the legal seat must be considered together.

2.2 DIAC Arbitration Rules 2022

The DIAC Arbitration Rules 2022 entered into force on 21 March 2022.

They generally govern newly commenced proceedings falling within their scope, subject to applicable exceptions and contrary agreements.

Parties should confirm the correct edition of the Rules before filing.

An arbitration agreement signed before March 2022 does not necessarily require proceedings under the former 2007 Rules.

The institutional rules applicable to commencement may depend on the wording of the arbitration agreement and the relevant transitional provisions.

2.3 Dubai Decree No. 34 of 2021 and Legacy Arbitration Clauses

Dubai Decree No. 34 of 2021 reorganised Dubai's institutional arbitration framework, including arrangements affecting the abolished Emirates Maritime Arbitration Centre and the DIFC Arbitration Institute.

Article 6 of the Decree preserves qualifying arbitration agreements referring to the abolished centres and provides for DIAC to assume the relevant institutional role, unless the parties agree otherwise.

The position may become more complicated where a historical agreement refers to DIFC-LCIA Arbitration or another legacy institutional mechanism.

Particular attention should be given to:

  • The date of the arbitration agreement.
  • The precise institution named.
  • Whether proceedings had already commenced.
  • The constitution of any existing tribunal.
  • The agreed procedural rules.
  • The governing law and jurisdiction.
  • Potential enforcement issues in other countries.

Parties should not automatically disregard an older arbitration clause or assume that every legacy agreement raises identical jurisdictional and enforcement considerations.

2.4 DIAC, DIFC and the Legal Seat of Arbitration

The legal seat of arbitration is a fundamental element of the procedural framework.

It helps determine which arbitration legislation applies and which courts exercise supervisory jurisdiction.

ConceptMeaning
Arbitration institutionOrganisation administering the proceedings, such as DIAC
Legal seatJurisdiction in which the arbitration is legally situated
Hearing venuePhysical or virtual location where hearings occur
Substantive governing lawLaw used to determine the underlying contractual rights
Supervisory courtCourt exercising relevant oversight under applicable arbitration law

Under Article 20.1 of the DIAC Arbitration Rules 2022, an agreed hearing location may determine the seat where the parties have not separately specified one.

In the absence of an agreed seat or location, the Rules provide for an initial DIFC seat, subject to the tribunal's final determination.

Parties should review the implications of their chosen seat, including the applicable DIFC or federal arbitration framework.

The DIFC Legal Database provides access to relevant DIFC legislation and amendment materials.

DIAC arbitration is not automatically seated in mainland Dubai simply because DIAC is based in Dubai.

3. Legal Requirements Before Commencing DIAC Arbitration

3.1 Establishing a Valid Arbitration Agreement

Arbitration ordinarily depends on an enforceable agreement between the relevant parties.

The agreement may appear within:

  • A commercial contract.
  • A construction agreement.
  • A shareholder agreement.
  • General or Particular Conditions.
  • A separate arbitration agreement.
  • An agreed submission of an existing dispute to arbitration.
  • Qualifying written contractual communications.

Before commencing DIAC arbitration, the claimant should determine whether the agreement covers the parties, claims and circumstances of the dispute.

The existence of an arbitration clause does not necessarily establish that every dispute involving the same commercial relationship falls within its scope.

3.2 Authority to Agree to Arbitration

Corporate authority may become particularly important where an arbitration agreement was signed on behalf of a company.

Relevant considerations include:

  • The legal identity of the contracting company.
  • The capacity of the signatory.
  • Applicable corporate authorisations.
  • Powers of attorney.
  • Board or shareholder resolutions where relevant.
  • Whether the signatory possessed the necessary authority under applicable law.

Do not confuse authority to sign an ordinary commercial agreement with the legal assessment of authority to conclude an arbitration agreement.

The required authority must be established according to the relevant corporate structure, governing law and circumstances.

3.3 Arbitration Agreement Scope and Multiple Contracts

Commercial projects often involve several connected agreements, including main contracts, subcontracts, guarantees and settlement agreements.

Those agreements may contain different dispute resolution provisions.

For example, one agreement may provide for DIAC arbitration, while another provides for litigation before a competent court.

The claimant should establish which agreement supports each proposed claim and whether the relevant parties are bound by the same arbitration mechanism.

Consolidation, joinder or multi-contract proceedings may be available under applicable rules, but these mechanisms are subject to procedural and jurisdictional requirements.

3.4 Mandatory Preliminary Dispute Resolution Procedures

Some agreements require parties to complete preliminary procedures before commencing arbitration.

These may include:

  • Formal contractual notices.
  • Negotiation between authorised representatives.
  • Engineer determinations.
  • Dispute adjudication board proceedings.
  • Amicable settlement periods.
  • Mediation.

Failure to complete a mandatory preliminary step may create procedural objections.

Whether the objection concerns jurisdiction, admissibility or another procedural issue depends on the applicable agreement and legal framework.

An arbitration clause should be reviewed in its entirety, not merely for the name of the arbitration institution.

3.5 Limitation Periods and Contractual Time Bars

Before filing, parties should establish the applicable statutory limitation periods and contractual notification requirements.

These may differ according to:

  • The nature of the claim.
  • The substantive governing law.
  • The date the obligation became due.
  • Contractual notice provisions.
  • Previous acknowledgements or settlements.
  • Relevant procedural legislation.

Negotiation or informal correspondence should not be assumed to suspend or interrupt a limitation period.

Where a deadline is approaching, obtain legal advice concerning the steps required to protect the claim.

4. How to Prepare and Submit a DIAC Request for Arbitration

4.1 What Is a Request for Arbitration?

A Request for Arbitration is the claimant's initial submission seeking commencement of institutional proceedings.

Its required contents are governed by Article 4 of the DIAC Arbitration Rules 2022.

The submission should identify the dispute, establish the contractual basis for arbitration and explain the relief requested.

A well-prepared Request should enable the institution and respondent to understand the parties, nature of the disagreement and relevant procedural proposals.

4.2 Information Required in the Request

The filing requirements include information concerning:

  • The parties and their contact details.
  • The arbitration agreement and relevant contractual documents.
  • Allocation of claims between multiple arbitration agreements, where applicable.
  • The circumstances underlying the dispute.
  • The requested remedies and estimated claim value.
  • Tribunal composition and applicable nominations.
  • The proposed or agreed seat and language.
  • The applicable substantive law.

The precise requirements should be checked against the official Rules when preparing the submission.

4.3 Supporting Documents for DIAC Arbitration

The documents required will depend on the dispute.

A practical preparation file may include the following:

Document categoryRecommended supporting records
Arbitration agreementExecuted contract containing the arbitration clause
Contractual documentsAmendments, schedules and relevant supplementary agreements
Corporate identificationTrade licences and incorporation documents
Representation authorityPowers of attorney and applicable corporate authorisations
Dispute chronologySummary of relevant contractual events
Contractual correspondenceNotices, demands and responses
Financial evidenceInvoices, payment certificates and account reconciliations
Breach evidenceReports, contractual instructions and contemporaneous records
Claim calculationPreliminary assessment of amounts and remedies sought
Procedural complianceEvidence of required negotiation or dispute escalation steps

Not every document listed above is a mandatory attachment to every initial Request.

The distinction between institutional filing requirements and recommended supporting evidence should be maintained.

4.4 Request for Arbitration Versus Statement of Claim

DocumentGeneral purpose
Request for ArbitrationInitiates the institutional arbitration procedure
Statement of ClaimPresents the claimant's substantive factual and legal case
Answer to the RequestProvides the respondent's preliminary position
Statement of DefenceSets out the respondent's detailed defence

A comprehensive Statement of Claim may accompany the initial Request under the Rules, but it is not invariably necessary at that stage.

The claimant should consider whether early submission of detailed pleadings is appropriate in light of the dispute's complexity, supporting evidence and applicable deadlines.

4.5 Where to Submit the Request

The official DIAC new-case registration page currently directs applicants to submit their application to:

cases@diac.com

Parties should confirm the current submission instructions, applicable documentary requirements and payment arrangements before filing.

Avoid relying exclusively on historical registration instructions or outdated institutional addresses.

4.6 When Does DIAC Arbitration Legally Commence?

Article 4.6 links institutional commencement to DIAC's receipt of a compliant, complete Request.

Consequently, submitting an incomplete application shortly before a legal deadline may create significant risk.

Failure to pay the required registration fee can also prevent registration.

Sending an arbitration demand to the opposing party is not necessarily equivalent to commencing DIAC proceedings.

The effect of commencement on any statutory limitation period must be assessed separately under the applicable law.

5. DIAC Arbitration Fees and Tribunal Appointments

5.1 How Much Does DIAC Arbitration Cost?

There is no single total fee applicable to every DIAC arbitration.

The institution assesses its charges under the applicable DIAC Table of Fees and Costs.

The overall cost may include:

Cost categoryGeneral purpose
Registration feeInitial institutional filing
Administrative feesAdministration of the arbitration
Tribunal feesRemuneration of appointed arbitrators
Tribunal expensesApplicable expenses arising during proceedings
Legal representationPreparation and presentation of the parties' cases
Expert feesTechnical, financial or other specialist evidence
Hearing expensesFacilities, interpretation and related services
Enforcement costsSubsequent recognition or execution proceedings

Parties should distinguish institutional charges from their overall legal and commercial expenditure.

5.2 Registration Fees and Advances on Costs

Payment of the initial registration fee does not ordinarily cover the entire arbitration.

DIAC may subsequently require advances towards the institutional and tribunal expenses.

The amounts can change as the scope or value of the dispute develops.

For current financial information, consult DIAC's official fees, costs and payment guidance.

A party should evaluate its ability to finance the proceedings, including possible additional contributions if another party does not pay its required share.

5.3 How Is the Arbitral Tribunal Appointed?

The number and appointment of arbitrators depend on the parties' agreement and applicable institutional rules.

Tribunals commonly consist of either one arbitrator or three arbitrators.

Tribunal compositionRelevant consideration
Sole arbitratorMay be appropriate for disputes requiring proportionate administration
Three-member tribunalMay be suitable for complex or high-value disputes
Specialist expertiseMay be relevant to construction, engineering or commercial issues
Independence and impartialityEssential considerations when assessing candidates

Party nominations remain subject to the applicable appointment and confirmation process.

A party-appointed arbitrator is not the legal representative of the party that nominated them.

Arbitrators must exercise their adjudicative responsibilities independently and impartially.

5.4 Can a Party Recover Its Arbitration Costs?

Depending on the applicable rules, legal framework and the tribunal's determination, a party may seek recovery of qualifying arbitration expenditure.

Such claims may involve institutional charges, legal representation and expert costs.

However, the successful party should not assume that every expense will necessarily be recovered in full.

The tribunal may consider the relevant circumstances when allocating costs.

6. What Happens After a DIAC Arbitration Request Is Filed?

6.1 Notification and the Respondent's Answer

Under Article 5.1 of the DIAC Arbitration Rules 2022, the respondent ordinarily has 30 days following notification of the Request to submit its Answer.

The Rules permit a conditional extension of up to ten days under Article 5.7.

The respondent may include preliminary objections, its position on the claims and proposals concerning the tribunal, seat and procedural framework.

Failure to respond does not automatically establish the claimant's entitlement to an award.

The tribunal must still address the claim under the applicable procedural framework.

6.2 Preliminary Case Management

Following constitution of the tribunal, the parties may be required to address procedural matters including:

  • The applicable procedural timetable.
  • Exchange of written submissions.
  • Document production.
  • Witness statements.
  • Expert evidence.
  • Confidentiality arrangements.
  • Hearing format.
  • Outstanding jurisdictional objections.

The precise procedure is determined according to the arbitration agreement, applicable rules and tribunal directions.

Parties should organise their evidence early rather than wait until the hearing timetable has been established.

6.3 Jurisdictional Objections

A respondent may challenge the tribunal's authority to determine the dispute.

Common objections include:

  • Absence of a binding arbitration agreement.
  • Lack of authority to conclude the agreement.
  • Claims falling outside the arbitration clause.
  • Incorrect parties.
  • Non-arbitrable subject matter.
  • Competing contractual jurisdiction provisions.

Registration of the case does not conclusively resolve these questions.

Jurisdictional objections must be addressed through the applicable institutional and legal mechanisms.

6.4 Expedited DIAC Arbitration

Article 32 of the DIAC Arbitration Rules 2022 establishes an expedited procedure for qualifying cases.

Potential grounds include the value of the dispute, written agreement between parties or exceptional urgency.

The original 2022 Rules specify a monetary threshold of AED 1 million, subject to their exceptions, subsequent institutional adjustments and the applicable transitional conditions.

Expedited proceedings require the relevant institutional approval.

They should not be assumed to apply automatically merely because the claim falls below a particular value.

6.5 Emergency Arbitration and Interim Protection

A party may require urgent protection before the main tribunal is constituted.

The DIAC Rules contain an emergency arbitration mechanism under Appendix II.

Depending on the dispute, urgent applications may seek to preserve assets, evidence or relevant contractual rights.

The appropriate procedure depends on:

  • The nature and urgency of the requested relief.
  • Available evidence.
  • The arbitration agreement.
  • The applicable law of the seat.
  • The measures available from competent courts or arbitrators.
  • Potential enforceability of the relief.

An emergency application does not replace the substantive arbitration claim.

The jurisdiction and enforceability of emergency relief require separate legal assessment.

6.6 How Long Does DIAC Arbitration Take?

The actual duration varies between cases.

Relevant factors include:

  • Complexity and value of the dispute.
  • Tribunal appointment.
  • Jurisdictional challenges.
  • Number of parties and contracts.
  • Evidentiary requirements.
  • Technical expert reports.
  • Extensions and procedural applications.

Applicable award deadlines should be distinguished from the overall elapsed time between filing, final determination and enforcement.

No standard completion date should be guaranteed.

6.7 Arbitral Awards and Enforcement

The tribunal may issue an award determining the parties' substantive rights and obligations.

Available relief depends on the claims, agreement and governing law.

An award may address contractual payments, damages, costs or other legally available remedies.

Receiving an award does not necessarily result in immediate payment.

Recognition and enforcement may require additional proceedings before the competent court, particularly where the losing party's assets are located in another jurisdiction.

Arbitral award enforceability and practical financial recovery are separate considerations.

Obtaining a favourable arbitral award is not necessarily the final stage of commercial dispute resolution. Where the losing party does not comply voluntarily, judicial recognition and execution proceedings may be required. Read our dedicated guide to recognising and enforcing arbitral awards in the UAE for further information on domestic awards, foreign awards and practical financial recovery.

7. Practical Steps and DIAC Arbitration Preparation Checklist

7.1 Illustrative Example: Commercial Payment Dispute

Assume that a UAE engineering company has completed contractual services but has not received an outstanding payment of AED 850,000.

Its agreement contains a DIAC arbitration clause and requires preliminary written notification of disputes.

Before filing, the company should:

  1. Examine the arbitration clause and governing law.
  2. Establish the contractual payment entitlement.
  3. Verify the legal identity of the debtor.
  4. Complete applicable preliminary notification procedures.
  5. Reconcile invoices and supporting financial records.
  6. Prepare the Request and arrange payment of institutional fees.
  7. Investigate whether expedited arbitration may be appropriate.
  8. Assess the debtor's assets and potential enforcement prospects.

The AED 850,000 claim may warrant consideration of expedited proceedings under the monetary criterion contained in the original 2022 Rules.

However, potential counterclaims, contractual provisions, applicable transitional arrangements and DIAC's decision may affect eligibility.

This hypothetical example illustrates case preparation rather than a predicted legal outcome.

7.2 DIAC Arbitration Preparation Checklist

Arbitration agreement and jurisdiction

  • Obtain the complete executed contract.
  • Identify the applicable arbitration agreement.
  • Verify the identity of the contracting parties.
  • Review signatory authority and corporate authorisations.
  • Establish whether the dispute falls within the clause.
  • Confirm the applicable institutional rules.
  • Identify the legal seat and substantive governing law.
  • Review statutory limitation periods and contractual time bars.

Preliminary procedural compliance

  • Identify mandatory negotiation requirements.
  • Review mediation or dispute board provisions.
  • Prepare applicable contractual notices.
  • Preserve evidence of notification and service.
  • Establish the chronology of the dispute.
  • Assess urgent protective measures where necessary.

Evidence and financial preparation

  • Collect contractual amendments and supporting documents.
  • Preserve original electronic correspondence.
  • Reconcile outstanding financial claims.
  • Prepare supporting contractual and technical evidence.
  • Identify relevant witnesses.
  • Assess requirements for expert evidence.
  • Estimate institutional, legal and expert costs.

Filing and recovery strategy

  • Prepare the Request for Arbitration.
  • Confirm the current DIAC submission instructions.
  • Arrange payment of the applicable registration fee.
  • Review proposed arbitrator qualifications.
  • Consider eligibility for expedited proceedings.
  • Monitor procedural deadlines.
  • Assess settlement opportunities.
  • Investigate potential award enforcement and recovery prospects.

How Mohamed Ghanem & Associates Can Assist

Commencing arbitration requires more than submitting contractual documents to an arbitration institution.

A coordinated legal strategy should consider agreement validity, jurisdiction, contractual procedures, supporting evidence, financial exposure and the potential enforcement of an award.

Through its Arbitration Law services, Mohamed Ghanem & Associates assists businesses and individuals in assessing and addressing arbitration-related disputes.

The firm's arbitration lawyers in Dubai may assist with:

  • Reviewing arbitration agreements.
  • Assessing jurisdiction and procedural requirements.
  • Preparing Requests for Arbitration and responsive submissions.
  • Evaluating tribunal appointment arrangements.
  • Reviewing contractual and technical evidence.
  • Preparing and defending commercial arbitration claims.
  • Assessing interim and emergency relief.
  • Reviewing settlement opportunities.
  • Advising on award enforcement and related proceedings.

For disputes arising from engineering agreements, infrastructure developments or construction projects, the firm's Construction Disputes services may also support the assessment of underlying contractual and technical issues.

Are you considering DIAC arbitration, or has your company received a Request for Arbitration?

Contact Mohamed Ghanem & Associates to arrange a legal consultation and obtain an assessment of your arbitration agreement, procedural obligations and available legal options.

8. Frequently Asked Questions

1. How do I start DIAC arbitration in Dubai?

Prepare a compliant Request for Arbitration, establish the relevant arbitration agreement, submit the required documents to DIAC and pay the applicable registration fee.

2. Can I start DIAC arbitration without an arbitration clause?

Ordinarily, an enforceable arbitration agreement is required. Parties may separately agree to refer an existing dispute to DIAC even if their original contract did not contain an arbitration clause.

3. What law governs DIAC arbitration?

The applicable framework depends on the legal seat, arbitration agreement and governing law. It may include UAE federal arbitration legislation or DIFC arbitration legislation, together with the applicable DIAC Rules.

4. What documents are needed to commence DIAC arbitration?

The required filing information includes the arbitration agreement and relevant contractual documents. Additional corporate, financial and evidentiary records may be necessary depending on the dispute.

5. Where should I submit a DIAC arbitration request?

DIAC's official registration guidance currently directs applicants to cases@diac.com. Confirm the latest submission instructions before filing.

6. When does DIAC arbitration commence?

Under Article 4.6 of the 2022 Rules, commencement occurs upon DIAC receiving the complete Request, as determined under the applicable requirements.

7. How long does a respondent have to answer a DIAC Request?

The standard period under Article 5.1 is 30 days following notification, subject to permitted extensions or other applicable procedural decisions.

8. Can DIAC arbitration proceed if the respondent does not participate?

Potentially, provided applicable notification and procedural requirements are satisfied. Non-participation does not automatically establish the merits of the claimant's case.

9. How much does DIAC arbitration cost?

Costs depend on the applicable institutional fee schedule, dispute value, tribunal composition, legal representation and other case-specific expenses.

10. What is the default seat of DIAC arbitration?

Where neither a seat nor a hearing location has been agreed, the 2022 Rules provide for an initial DIFC seat, subject to the tribunal's final determination.

11. Is DIAC arbitration the same as DIFC Courts litigation?

No. DIAC administers arbitration, whereas the DIFC Courts exercise judicial jurisdiction. A DIAC arbitration may nevertheless involve the DIFC as its legal seat.

12. Can DIAC arbitration be conducted in English?

Yes. The arbitration language depends on the parties' agreement and applicable institutional or tribunal determinations.

13. Can I request expedited DIAC arbitration?

Potentially. Eligibility depends on Article 32, applicable monetary criteria, party agreements, urgency, transitional provisions and institutional approval.

14. Can I obtain urgent protection before the tribunal is appointed?

Potentially. Emergency arbitration or competent court procedures may provide protective relief where the applicable legal and procedural requirements are satisfied.

15. Is DIAC arbitration confidential?

The Rules establish confidentiality protections, subject to applicable exceptions, legal obligations and permitted disclosure requirements.

16. Can a DIAC arbitration award be enforced outside the UAE?

Potentially. International enforcement depends on applicable treaties, local legislation and recognition procedures in the jurisdiction where enforcement is sought.


This article provides general legal information concerning DIAC arbitration procedures in Dubai and the UAE. It does not constitute individual legal advice. Arbitration jurisdiction, procedural obligations, costs, available remedies and award enforceability depend on the applicable agreement, rules, legislation and circumstances of each dispute.